Doha Airport

In order to quickly cool down the largest A380 aircraft housed at the HMH Bay in Doha, DuctSox MENA was selected to design the ventilation ducting for the world’s biggest aircraft maintenance hangar at the New Doha International Airport (CP -26).

For a quick reduction of large aircraft temperature from 50 ⁰C to 37⁰C, the ductwork was installed at 45 meters from the finish floor. Instead of the expected 60 minutes for the required temperature to be achieved, the cooling was finished as fast as in 45 minutes, saving 25% of the time as a result.

The DuctSox MENA team has also provided its technical knowledge and support in order to assist with the design, delivery and installation in this important project.

“We have selected to use the DuctSox services and Textile Air Dispersion products, particularly Sedona-XM. It is a very reliable product with an even air distribution and effective area cooling, which requires balance temperature at all time.

The total services offered by DuctSox were excellent. They have been on our side to help with the design, delivery as well as the installation. DuctSox was so helpful and the technical knowledge and support given to us for our project was exceptional.“

George E
Project Manager.
CP-11 ADCC, Qatar

“Choosing and using DuctSox was amazing, technically and in response the material did pass and exceeds our requirements. The design, and the support during the installation and even the after sales support were terrific.”

Huwaida H.
CP-26 ADCC, Qatar